Proposal template

Architecture proposal template

An architecture proposal in seven sections for a home addition and renovation: what your clients told you, five phases in plain words, what the fee doesn't cover, one fixed fee with a way out after the first phase, and the next steps. For architects and small practices. Read it here or get it as a Word file and a PDF.

Michael Koper
By Michael Koper, founder of Nusii Updated
The architecture proposal template: the cover and the investment page, a fixed $40,000 fee in five phases
Get the Word + PDF
On this page
  1. What to include
  2. The template
  3. A filled-in example
  4. How to write one
  5. See it as your client will
  6. What to charge
  7. The email to send
  8. After you send it
  9. Word and PDF
  10. Questions

What should an architecture proposal include?

An architecture proposal is the document an architect sends after the first site visit to say what they'll design, in which phases, by when and for what fee. It should say what the clients told you and what stays, the phases in plain words, what's included and what isn't (the town's fees, engineers, surveys), your fee and the construction budget it assumes, and how to say yes. The template below has a section for each.

  1. 1 IntroductionWho you are, the plan, your fee and the construction budget it assumes.
  2. 2 What we heardWhat the clients told you, what stays, and what success looks like.
  3. 3 How we'll workFive phases in plain words, from measuring the house to the build.
  4. 4 Homes we've designed for clients like youHomes you've designed for clients like these.
  5. 5 What's includedWhat's included and what isn't, what you need, and who owns the drawings.
  6. 6 InvestmentOne fixed fee in five phases, with a way out after the first.
  7. 7 Next stepsHow to say yes, and when you'll follow up.

The architecture proposal template, section by section

Copy one section or the whole thing. Under each section: what it's for, and one thing we've learned from the proposals sent with Nusii.

[Yellow] you write [Green] Nusii fills in when you send it

1. Introduction

The whole plan in two sentences, with your fee, the construction budget it assumes and the way out, then who you are. A partner who missed the site visit reads it too. Working on your own? Write "I" instead of "we".

Hi [Client first name],

Thanks for showing us around [your house] on [date of your visit]. You told us that [the problem in one sentence, in the clients' words, such as "the kitchen is too small for the five of us, and we'd rather add on than move"].

In short: we design [a primary suite addition and a new kitchen] for [your 1950s ranch house], draw it for the permit, help you choose a builder, and visit the site while it's built. Our fee is a fixed [$40,000] in five phases, [10%] of the [$400,000] you plan to spend on construction. You approve each phase before the next one starts, and you can stop after the first.

[Your practice] is a [number]-person architecture practice in [city]. We've designed [additions and renovations for older homes] since [year].

[Your name]
[Your role], [Your practice]

About a third of first views in Nusii are on a phone. Put the fee and the construction budget it's based on in the first lines: a homeowner comparing architects looks for that number first, and $40,000 next to a $400,000 build reads very differently from $40,000 on its own.

2. What we heard

Shows you listened, says what stays, and sets a goal you can both check, with the budget in it. Only you can write this one: replace the examples with what your clients said at the site visit, in their words.

Each goal below answers something you told us. If we got anything wrong, tell us before you accept and we'll fix it.

  • You said [the kitchen is where everyone ends up, and five people can't fit in it]. We'll design [a kitchen that opens to the family room, with an island that seats four].
  • You said [your neighbors' addition ended up $120,000 over budget]. We'll check the design against [your $400,000 budget] at the end of every phase, and get builders' prices before the drawings are final, not after.
  • You said [the town held up a friend's permit for four months]. We'll check [the zoning and setback rules] before we draw anything, and answer the town's questions on the permit for you.

What stays: [what the clients want kept, such as "the front of the house the street sees and the oak floors in the hall"]. We'll design around it.

What success looks like: [a result you can both check, with dates and the budget, such as "drawings at the town by March, a builder's price within $400,000, and Thanksgiving in the new kitchen"].

What it's worth to you: [in the clients' words, such as "staying near the kids' school instead of buying a bigger house, which your realtor put at about $300,000 more"].

If nothing changes: [what the clients said happens if this doesn't go ahead, such as "another year of eating in shifts, then a move you don't want to make"].

Ask what friends and neighbors went through when they built. The budget is usually the fear a homeowner doesn't say out loud, and naming it here, with what you'll do about it, answers it. "Repeating a client's problems back to them in the proposal, using language they've actually used, is very powerful stuff," says our 2015 book on proposals.

3. How we'll work

The project in five phases, in plain words with the names builders and towns use, what the clients approve at each one, and when they'll be in the new rooms. The first line says why the cheaper route won't do the job; if you didn't talk about one, delete it.

We talked about [hiring a builder who draws the plans too]. It costs less, but [you'd get permit drawings, not a design for how you live, and no one on your side during the build]. You approve each phase before the next one starts.

  1. Weeks [1 to 4]: measuring and first designs (schematic design). We measure the house, draw it as it is today, check the zoning rules, and show you [two] layouts as floor plans and simple 3D views, with a rough cost for each. You choose one and get [two] rounds of changes.
  2. Weeks [5 to 9]: developing the design (design development). Windows, materials, the kitchen and the structure, worked out with [the structural engineer], and a cost estimate checked against your budget.
  3. Weeks [10 to 15]: construction drawings and the permit (construction documents). The drawings and specifications a builder prices and builds from. We file them with [the town] and answer its questions.
  4. Weeks [14 to 18]: choosing a builder (bidding). We send the drawings to [three] builders you've agreed on, answer their questions, and go through their prices with you line by line.
  5. During the build, about [seven] months (construction administration). We visit the site at [the foundation, the framing, before the walls are closed, and the final walkthrough], answer the builder's questions, and check each payment request before you pay it.

When you'll see results: your layouts in [four] weeks, drawings at the town in [15], a builder's price in [18], and the new rooms [seven] months into the build. The permit review and the builder's schedule aren't in our hands.

"When it comes to clients, never presume. No jargon, no BS," says the chapter on plain words in our 2015 book on proposals. Your clients will hear "schematic design" and "CDs" from the builder and the town, so give them the plain name and the trade name side by side.

4. Homes we've designed for clients like you

Short proof for whoever wasn't at the site visit: two projects like this one, with what changed, how long it took and how close it came to the budget, and three photos of the closest one. Use real projects with the clients' permission, or leave this section out.

  • [Past client], [kind of house]: [what changed, with numbers, such as "600 square feet added, permitted in seven weeks, 4% under budget"]. [Link to the photos]
  • [Past client], [kind of house]: [what changed, with numbers]. [Link to the photos]

[Three photos of the finished project closest to this one. Replace these with your own:]

A white single-story addition with glass doors across the back of a two-story house A bright kitchen with a walnut island and a dining table by tall windows A bedroom with floor-to-ceiling windows and a slatted wood wall
Photos: Brett Jordan, Clay Banks, Hans on Unsplash

"[A one-line quote from one of those clients.]" [Name, town]

Three photos of the finished project closest to this one, and a link to the rest. In Nusii, proposals with images were accepted less often than those without (43% against 56% for the same senders, July to September 2026), though that may say more about the projects than the pictures. Your clients found you through your work; this section only has to remind them, so keep it to a few that match the job.

5. What's included

Draws the line between what you'll do and what you won't, what you need from the clients, and who owns the drawings. On a house, the line that saves the most arguments is the one about what the fee doesn't cover: the town's fees, the engineer and the survey.

Included

  • Measuring the house, drawing it as it is today, and checking the zoning and code rules for [your lot]
  • [Two] layouts to choose from, with [two] rounds of changes on the one you choose
  • The developed design, with a cost estimate checked against your budget at the end of each design phase
  • Construction drawings and specifications, filed with [the town] for the permit, and answers to its questions
  • Working with [the structural engineer] and including their drawings in the set
  • Sending the drawings to [three] builders and comparing their prices with you
  • Up to [10] site visits during the build, answering the builder's questions and checking their payment requests

Not included

  • The town's permit and filing fees, which you pay to [the town]
  • The structural engineer, [the land survey] and soil tests: we coordinate them, and they bill you directly
  • Interior design, furniture and landscape design
  • Changes after you've approved a phase, and site visits beyond [10], at [$175] an hour, quoted first
  • Printing and travel beyond [30 miles], at cost

What we need from you: [a survey of your lot, if the town asks for one], decisions within [a week] at the end of each phase, access to the house for measuring, and a budget that keeps [10%] aside for surprises behind the walls. You hire the builder directly. Each week a decision slips moves the dates by a week.

What you keep: the drawings of your house as it is today are yours from the first phase. We keep the copyright in the design, and you get the right to use the drawings to build this project at [your address]. We may photograph the finished house for our portfolio, never with your name or address; tell us if you'd rather we didn't.

When a homeowner on Reddit's r/askarchitects asked whether a $12,000 proposal for a small addition was fair, the replies asked the same three things: how many rounds of changes, whether the permit fees were included, and whether the architect would oversee the build. Answer all three here, so your clients don't have to ask.

6. Investment

One fixed fee in five phases, the share of the build it represents, how it's invoiced, and a way out after the first phase. These are example prices; the table further down shows what architects charge.

Measuring and first designs (schematic design)

$5,000

Measuring, the zoning check, [two] layouts with rough costs and [two] rounds of changes. If neither layout suits you, tell us within [two weeks]: you pay for this phase only.

Developing the design (design development)

$8,000

Construction drawings and the permit (construction documents)

$16,000

Drawings and specifications for the permit and the builder, filed with [the town].

Choosing a builder (bidding)

$2,000

During the build (construction administration)

$9,000

Up to [10] site visits over a [seven]-month build, the builder's questions answered and each payment request checked. The fee is [10%] of your [$400,000] budget and stays fixed if the builder's price changes. Each phase is invoiced as it starts; this one monthly.

Total: $40,000

Fixr's cost guide puts architects at 8% to 10% of the build for a new home and 12% to 18% for an addition, so $40,000 on a $400,000 addition is a modest example. Proposals over $15,000 got a yes about a third of the time in Nusii (July to September 2026), which is what the way out is for: a homeowner who isn't sure yet risks $5,000, not $40,000.

7. Next steps

Tells the clients exactly what to do to say yes, what happens next, and when you'll call.

  1. If the plan works for you, accept and sign this proposal.
  2. We'll send the first invoice for [$5,000] and book the measuring visit for [a date in the next two weeks].
  3. [If your town needs a survey of the lot, order it now: surveyors are often booked a few weeks out.]

I'll call you on [a day three to five days from now] to answer any questions. If you have any before then, call me on [phone number] or reply to the email this proposal came with.

A couple usually decides together, sometimes after a talk with their lender, so give it a few days, then call. Philip Morgan and Jonathan Stark suggest three to five days for most proposals in our 2015 book. With Nusii you see when the proposal was opened, so you know it has reached them.

An architecture proposal example, filled in

Two sections of the template above with the clients' words in the brackets, so you can see how it reads when it's done. The clients, a couple with three children in a 1950s ranch house, are made up, and so are their numbers.

Your new kitchen and primary suite, designed within budget and ready to build by April

What we heard

  • You said the kitchen is where everyone ends up, and five people can't fit in it. We'll design a kitchen that opens to the family room, with an island that seats four.
  • You said your neighbors' addition ended up $120,000 over budget. We'll check the design against your $400,000 budget at the end of every phase, and get builders' prices before the drawings are final, not after.
  • You said the town held up a friend's permit for four months. We'll check the zoning and setback rules before we draw anything, and answer the town's questions on the permit for you.

What stays: the front of the house the street sees and the oak floors in the hall. We'll design around it.

What success looks like: drawings at the town by March, a builder's price within $400,000, and Thanksgiving in the new kitchen.

What it's worth to you: staying near the kids' school instead of buying a bigger house, which your realtor put at about $300,000 more.

If nothing changes: another year of eating in shifts, then a move you don't want to make.

Investment

Measuring and first designs (schematic design)

$5,000

Developing the design (design development)

$8,000

Construction drawings and the permit (construction documents)

$16,000

Choosing a builder (bidding)

$2,000

During the build (construction administration)

$9,000

Total: $40,000

How to write an architecture proposal, step by step

Six steps, from the first site visit to the follow-up. The template above already follows them; here's why each one matters.

  1. Ask the right questions at the site visit

    Find out what the clients want from the house, what has to stay, what they've heard from friends who built, the date that matters to them, who decides, and what they plan to spend. Write the answers down in their words: they become the "What we heard" section. Our 10 questions for the first client call cover the rest.

  2. Measure and check the zoning before you price

    Setbacks, height limits, lot coverage, a historic district or an HOA can change what you can build, and so what the design costs you. A proposal written before you know them guesses at the work. Check them, then send the proposal within the few days you promised.

  3. Ask about the construction budget and your fee separately

    Homeowners often have one number in mind for everything. Split it on the call: what they plan to spend on the build, and what they expect to pay you. Here's how eight freelancers and agency owners ask about the budget.

  4. Name the phases in plain words

    "Schematic design" means little to most homeowners. Write "measuring and first designs", with the trade name next to it, and say what the clients approve at the end of each phase. They'll hear the trade names from the builder and the town, so they need both.

  5. Choose how to price it, and show the budget next to the fee

    A fixed fee per phase gives the clients one number. A percentage of the construction cost moves with the builder's price: 10% of $400,000 is $40,000, and 10% of $460,000 is $46,000. Hourly needs a cap per phase. Whichever you choose, say which construction budget your fee assumes, and what the fee doesn't cover: the town's fees, the engineer, the survey.

  6. Send it soon after the visit, and say when you’ll call

    End the proposal with the day you'll call, three to five days out, and call then. A couple usually decides together, sometimes with their lender. With Nusii you see when the proposal is opened, so you know whether it has reached them.

See it as your client will

Every page of the PDF, printed by Nusii. Sent as a link, it's one scrolling page on any device: your client accepts with one button and signs with their name.

Open the live preview

The template in Nusii, the way your client will see it. It opens in a new tab.

What to charge for architecture

What architects charge for houses, from the published figures we could check. The template's example, a fixed $40,000 for a $400,000 addition and kitchen, is 10% of the build: inside the usual range for a house, and below Fixr's range for an addition. Before you name your fee, find out what the clients plan to spend on construction and on you, separately.

What Price
Share of the construction cost, home addition 12% to 18% a cost guide's national figure Fixr
Share of the construction cost, new home 8% to 10% the same guide Fixr
Share of the construction cost, homes overall 8% to 15% (average) 5% to 20% at the ends Bob Vila
Hourly rate $100 to $200 an hour most architects; principals $150 to $250 in another guide Fixr
Flat fee, home addition with construction oversight $8,000 to $20,000 drawings only: $4,000 to $9,000 Fixr
Flat fee, remodel with construction oversight $16,000 to $40,000 drawings only: $8,000 to $10,000 Fixr
Fee per square foot $2 to $15 the same guide Fixr
Split of the fee by phase (rule of thumb) 10% / 25% / 40% / 5% / 20% schematic design, design development, construction documents, bidding, construction AIA

Sources: Fixr, a home cost guide, updated December 2022; Bob Vila, a home cost guide, July 2023; AIA, Best Practices: Budgeting for the construction phase. Fixr's and Bob Vila's figures are what homeowners pay, collected for cost guides. The AIA paper gives the split by phase as a traditional rule of thumb and argues it leaves too little for the work during construction. Nusii doesn't have enough architecture proposals to add a row of its own.

How often proposals got a yes, by price

Proposals over $15,000 got a yes about a third of the time. Put the construction budget next to your fee, so the number reads as the share of the build it is. From 1,713 proposals first sent with Nusii, July to September 2026.

Under $1,000
67.1%
$1,000 to $5,000
50.7%
$5,000 to $15,000
48.9%
$15,000 to $50,000
36.1%
Over $50,000
33.3%

Share accepted, by the total the client saw. Bigger proposals are bigger decisions, so this shows what happened, not that a lower price would win. Method: The State of Proposals 2026.

The email to send it with

The proposal does the explaining, so the email only has to get it opened and say when you'll call. Leave the fee out, so your clients read the plan before they judge the number. In Nusii this goes in the Send Proposal window, and you can save it as your template for next time.

Subject: [The plan for your kitchen and primary suite]

Hi [first name],

Here's the proposal we talked about when I visited on [day of your visit]: [link].

In short: we start by measuring the house and showing you two layouts, and you approve one before anything else happens. If neither is right for you, you can stop there.

It's short, and you can accept it right on the page. If anything's off, reply to this email and I'll change it.

I'll call you on [a day three to five days from now] to answer any questions.

[Your name]

What happens after you send it

From 309 proposals design studios first sent with Nusii, November 2025 to October 2026.

51.8%
were accepted
36 minutes
median time to the client's first look
1.1 days
median time to a yes
76.3%
of the yeses came within a week

Clients rarely say no. Of all proposals sent with Nusii from July to September 2026, 6.5% were rejected and 45.2% got no answer either way. Silence is the usual no, so a follow-up is worth sending.

These are design studios' numbers. Architects are a small part of them: too few architecture proposals go out with Nusii to report on their own. A house is a bigger decision than most design work, so expect a longer wait than these medians, and call three to five days after you send it. In Nusii you see when the proposal was opened, so you can call once it has.

More numbers and the method: The State of Proposals 2026.

Get the Word and PDF files

The same template as a Word file you can edit (it opens in Google Docs too) and a PDF printed by Nusii. We'll email you both, plus a few emails with proposal tips. Unsubscribe any time.

Or send it with Nusii

This template is in the gallery of every Nusii account. Send it as a link: you get an email when your client opens it, and they accept and sign online, on any device.

I own a small design agency, and Nusii has made it easy to send a proposal and get signatures all at once. Can’t beat it for the price!

Danielle K. Lambert
Danielle K. Lambert
Founder & CEO, The Snout Group

Not only does Nusii save me loads of time, but my clients are equally impressed with how professional I come across. I love it!

Laura Williams
Laura Williams
Founder, client-portal.io
Start your free trial

14-day trial · 60-day money-back guarantee

Questions about architecture proposals

What is an architecture proposal?

The document an architect sends after the first meeting or site visit, saying what they’ll design, in which phases, by when and for what fee. Some firms call it a fee proposal or a proposal for architectural services. It comes before the contract, or with it.

What should an architectural proposal include?

What the clients told you and what stays, the phases from measuring to the build, short proof from projects like it, what’s included and what isn’t, who owns the drawings, one fee with the construction budget it assumes, and the next steps. That’s seven sections, the same as the template on this page.

How much do architects charge for a house?

Usually a share of the construction cost. Fixr puts new homes at 8% to 10% and additions at 12% to 18%, and Bob Vila puts the average at 8% to 15%; most hourly rates in Fixr’s guide are $100 to $200. This template uses a fixed $40,000 for a $400,000 addition and kitchen, 10% of the build, as an example price.

Should I charge a fixed fee or a percentage of the construction cost?

Both are common; the difference shows when the builder’s price comes in. At 10%, a $400,000 build costs $40,000 in fees, and if the builder prices it at $460,000 the fee becomes $46,000. A fixed fee stays at $40,000, which is easier for a homeowner to plan around. This template uses a fixed fee per phase and states the percentage next to it.

How should I split my fee across the phases?

The AIA’s traditional rule of thumb is 10% for schematic design, 25% for design development, 40% for construction documents, 5% for bidding and 20% for construction. An AIA best-practices paper warns that 20% rarely covers the work during construction, so price that phase by the site visits and meetings it needs. This template’s split is 12.5%, 20%, 40%, 5% and 22.5%.

Is an architecture proposal the same as a contract?

No. The proposal says what you’ll do and what it costs; the contract adds the legal terms, such as liability, insurance and what happens if the project stops. Many US architects sign an AIA owner-architect agreement once the proposal is accepted. This template covers the scope, the fee and who owns the drawings in plain words, and it isn’t legal advice.

What’s the difference between an RFQ and an RFP in architecture?

An RFQ (request for qualifications) asks who you are and what you’ve built; an RFP (request for proposal) asks how you’d do the project and for what fee. Both usually come from public clients and institutions, with a format you have to follow. This template is for a private client who asked you directly.

Can I use it for a new home or a commercial project?

Yes. For a new home, swap measuring the house for the site survey and the brief; for an office or a shop, set the goal in the business’s terms (an opening date, seats, staff) and add the landlord’s approval to “What we need from you”. The phases and the fee structure stay the same.

Can I use this template as a freelance architect or an architectural designer?

Yes. Leave out the phases you don’t do and say who does them. If you draw plans without an architect’s license, check what your state lets you design and who signs the permit drawings. Everything else works the same.

Should I put renderings and photos in the proposal?

A few, of a finished project like this one. Your clients have seen your work already, and in Nusii proposals with images were accepted less often (43% against 56% for the same senders, July to September 2026), though that may say more about the projects than the pictures. This template has one row of three photos and a link to the rest; design options belong in the first paid phase, not the proposal.

Should I offer packages, like design only or full service?

Only if the clients asked for a choice. In Nusii, proposals where the client could choose between options were accepted less often (40% against 52% for the same senders, July to September 2026). This template sends one fee and lets the clients stop after the first phase.

How long should an architecture proposal be?

Short enough to read on a phone. In Nusii, accepted proposals had a median of 7 sections and the rest 9 (July to September 2026), and about a third of first views are on a phone. This template has seven; the drawing list and the contract can follow as attachments.

More templates and guides

Send your next architecture proposal as a link, and see when it's opened

Try Nusii free for 14 days

Cancel anytime · 60-day money-back guarantee